The narrative is consistent. First, fudged figures of thousands of roads kms constructed. When the figures are busted, the tune changes to low volume and high volume roads. This was the tune with SGR. When the inflated cost was flagged before construction, the claim was that it would see high ROI in just a few months. When that was busted, the tune has changed to Uganda sabotage, long-term investment blah blah. Better stick to the digital silk roads.